Uhland Road Improvements

Uhland Road Project Map

This project is funded through HUD's Community Development Block Grant Disaster Recovery Program (CDBG-DR) funds following the 2015 flood events. The project will improve drainage and mobility along Uhland Road during rain events. 

The project includes:

- The reconstruction of County Road and Uhland Road between IH-35 and approximately 200ft south of the Aquarena Springs Dr. intersection.

- Stormwater drainage system along County and Uhland Roads with an outfall to the Blanco River.

- Sidewalk extension along Uhland Road to Aquarena Springs Drive.

- Water and wastewater improvements along Uhland Road.

- Uhland Road and River Road intersection improvements.

Total project cost estimated at $4.2M. Design started in September 2017. Construction anticipated to begin in summer 2019.