223-126 |
Midway St. Utility Improvements |
Rachel Shelton |
Cedar Hills Construction |
6.7.2023 |
$1,398,490 |
223-061 |
S. Guadalupe St. Tree Maintenance |
Rachel Shelton |
Diamondback Landscaping & Lawn Care, Inc. |
03.27.2023 |
$48,240.00 |
223-043 |
Electrician Services |
Dustan Lukasik |
CT Electric and Alterman |
03.28.2023 |
$100,000.00 |
223-026 |
IH35 S Water Improvements - Clovis |
Rachel Shelton |
BRCT, LLC dba Blackrock Construction |
04.04.2023 |
$264,074.00 |
223-025 |
Hills of Hays Drainage Improvements |
Rachel Shelton |
Aaron Concrete Contractors, LLC |
04.04.2023 |
$3,152,030.00 |
223-014 |
Utility Cut Patching IDIQ |
Rachel Shelton |
Westhill Paving, Inc. |
06.28.2023 |
$89,250.00 |
223-005 |
Briarwood Waterline Improvements |
Rachel Shelton |
Cedar Hills Construction, LLC |
02.21.2023 |
$1,346,381.00 |
222-258 |
Sand for Transportation |
Dustan Lukasik |
Colorado Material, Inc. |
10.07.2022 |
$18,000.00 |
222-255 |
Substation Relay Parts |
Dustan Lukasik |
Control Panels USA, Inc. |
08.26.2022 |
$35,870.00 |
222-240 |
Surface and Edge Milling IDIQ |
Rachel Shelton |
Dustrol, Inc. |
03.01.2023 |
$171,250.00 |
222-239 |
Hot Mixed Asphalt Concrete IDIQ |
Rachel Shelton |
Brauntex Materials, LTD |
09.16.2022 |
$49,999.99 |
222-214 |
West Purgatory Creek WW Improvements |
Rachel Shelton |
Qro Mex Construction Co., Inc. |
03.02.2023 |
$2,381,741.00 |
222-210 |
Police Department Flooring Project |
Rachel Shelton |
Azteca Designs, Inc. |
07.05.2022 |
$186,732.82 |
222-207 |
Clovis Barker Guardrail Repair |
Rachel Shelton |
Henderson Bros Construction, LLC |
06.16.2022 |
$20,900.00 |
222-206 |
Blanco Riverine Flood Mitigation |
Rachel Shelton |
M.A. Smith Contracting Co. |
09.06.2022 |
$14,681,085.70 |
222-171 |
Loop 82 & Bobcat Stadium RRFB |
Rachel Shelton |
Jerdon Enterprise, L.P. |
07.05.2022 |
$82,364.00 |
222-156 |
Fire Training Facility |
Rachel Shelton |
Tegrity Contractors, Inc. |
07.05.2022 |
$2,777,777.00 |
222-152 |
Activity Center Roof Repair |
Rachel Shelton |
Duro-Last, Inc. |
05.23.2022 |
$42,747.97 |
222-128 |
HWY 21 Water Line Extension Project |
Rachel Shelton |
EVT Constriction, LLC |
06.13.2022 |
$5,593,100.00 |
222-089.2 |
Concrete Construction Services IDIQ |
Rachel Shelton |
Myers Concrete Construction |
05.03.2022 |
$300,000.00 |
222-079 |
Clovis Barker Guardrail Repair |
Rachel Shelton |
All Bids Rejected |
05.03.22 |
No Award |
222-010 |
Business Retention & Expansion Software |
Kate Stapp |
Bludot |
12.07.2021 |
$8,856 |
222-013.1 |
CDBG Housing Construction Services |
Rachel Shelton |
Byrdson Services, LLC |
04.19.2022 |
$1,330,000 |
222-013.2 |
CDBG Housing Construction Services |
Rachel Shelton |
DSW Homes, LLC |
04.19.2022 |
$1,330,000 |
222-012.1 |
CDBG Housing Rehabilitation Contractor CSP |
Rachel Shelton |
Byrdson Services, LLC |
04.19.2022 |
$813,000 |
222-012.2 |
CDBG Housing Rehabilitation Contractor CSP |
Rachel Shelton |
TLI & Environmental Services |
04.19.2022 |
$813,000 |
222-012.3 |
CDBG Housing Rehabilitation Contractor CSP |
Rachel Shelton |
DSW Homes, LLC |
04.19.2022 |
$813,000 |
222-004 |
Lift Station No 5 Replacement |
Rachel Shelton |
Udelhoven, Inc |
02.01.2022 |
$919,930.03 |
222-001 |
Midtown Drainage Improvement Project |
Rachel Shelton |
D&S Concrete Contractors, LLC |
02.21.2023 |
$2,182,211 |
221-260 |
Spoilage Dump Site |
Connie Singleton |
A.E. Cummings, Inc. |
03.10.2021 |
$48,000 |
221-209 |
Feltner Alley Wastewater Line Improvement Project |
Rachel Shelton |
Cedar Hills Construction |
01.04.2021 |
$345,842 |
221-198 |
Discovery Center Renovations |
Rachel Sheton |
JR Thomas Group, Inc. |
08.21.2021 |
$48,698.01 |
221-189 |
Natural Area Vault Restrooms |
Rachel Shelton |
CXT Incorporated |
11.08.2021 |
$89,109 |
221-183 |
Sessom Drainage & Street Improvements |
Rachel Shelton |
Austin Underground, Inc. |
03.23.22 |
$5,746,040.25 |
221-177 |
Surface Water Treatment Plant Improvements |
Rachel Shelton |
Archer Western Construction, LLC |
01-18-2022 |
$12,945,554.10 |
221-167 |
Grant Harris Dumpster Enclosure |
Rachel Shelton |
All Bids Rejected |
07.27.2021 |
No Award |
221-166 |
Guardrail Repairs |
Rachel Shelton |
Henderson Bro's Construction, LLC |
08.02.2021 |
$28,005 |
221-154 |
City Hall Complex Dumpster Enclosure |
Rachel Shelton |
Clearfield Construction |
08.08.2021 |
$24,441 |
221-142 |
Traffic Signal Construction & Maintenance IDIQ |
Rachel Shelton |
Austin Traffic Signal Construction |
08.17.2021 |
$390,000 |
221-128.1 |
SMEU Civil IDIQ |
Rachel Shelton |
Alterman Energy Services, Inc. |
08.03.2021 |
$3,000,000 |
221-128.2 |
SMEU Civil IDIQ |
Rachel Shelton |
Rural Electric, Inc. |
08.03.2021 |
$2,000,000 |
221-125 |
Electrical Distribution Construction IDIQ |
Rachel Shelton |
Greenstone Electric Svcs. |
11.10.2021 |
$5,752,830.00 |
221-113 |
San Marcos Downtown Accessible Pedestrian Traffic Signal Improvements |
Rachel Shelton |
Myers Concrete Construction, LP |
02.14.2022 |
$368,052.04 |
221-112 |
Gary Sports Complex Field Lighting |
Rachel Shelton |
Musco Sports Lighting, LLC |
06.15.2021 |
$847,000 |
221-105 |
Qualified Engineering Services List for 2021-2027 |
Veronica Bradshaw |
American Structurepoint, Inc.; Ardurra Group, Inc.; BGE, Inc.; Burns & McDonnell Engineering Co., Inc.; CDS Muery; Cobb, Fendley & Associates, Inc.; Freese & Nichols, Inc.; Halff Associates, Inc.; HDR Engineering, Inc.; Jones & Carter, Inc.; K Friese & Associates, Inc.; Kimley-Horn and Associates, Inc.; LJA Engineering, Inc.; Lockwood, Andrews & Newnam, Inc.; Maestas & Associates, LLC; Pape-Dawson Engineers, Inc.; Plummer Associates, Inc.; RPS; Scheibe Consulting, LLC; and Vickrey & Associates, LLC |
04.19.2022 |
Qualified List Only |
221-042 |
Children's Park Playscape Shade Structures |
Rachel Shelton |
T.F. Harper & Associates, LP |
01.19.2021 |
$160,007.25 |
221-069 |
Blanco Gardens Drainage Improements |
Rachel Shelton |
Santa Clara Construction LTD |
01.08.2021 |
$15,222,644 |
221-039 |
Cemetery Ossuary & Columbaria Improvements |
Rachel Shelton |
MLP Ventures, Inc |
04.20.2021 |
$133,806 |
221-036 |
Sessom Creek Bank Stabilization & WW Replacement PH 1 |
Rachel Shelton |
Santa Clara Construction, Ltd. |
05.04.2021 |
$3,186,928 |
221-034 |
SMEU Civil IDIQ |
Rachel Shelton |
All Bids Rejected 3-2-2021 |
|
No Award |
221-028 |
WWTP Electric Back Feed Distribution |
Rachel Shelton |
Rural Electric, Inc. |
03.02.2021 |
$1,652,864 |
221-019 |
IBM's Maximo Asset Management Support Services |
Aaron Miranda |
JFC & Associates |
03.15.2021 |
$90/Hour |
221-015 |
Street Overlay IDIQ |
Rachel Shelton |
Asphalt Inc/dba Lone Star Paving |
3.10.2021 |
$1,675,625 |
221-011 |
Rio Vista Falls Maintenance Project |
Rachel Shelton |
Austin Filter Systems, Inc. |
03.02.2021 |
$966,730 |
221-010 |
Rattler Substation |
Rachel Shelton |
Lambda Construction I, LTD |
03.05.2021 |
$6,448,491 |
220-257 |
S Guadalupe St. Sidewalk & Landscaping Improvements |
Rachel Shelton |
New Age General Contractors, Inc. |
01.19.2021 |
$793,199.25 |
220-255 |
SMEU Switchgear Building |
Rachel Shelton |
Electric Technical Industries |
11.17.2020 |
$802,300 |
220-253 |
Fiber Optic Installation, Repair Maintenance |
Rachel Shelton |
TDC2, LLC |
1.19.2021 |
$700,000 |
220-245 |
Fire Station No. 6 |
Rachel Shelton |
Seidel Construction, LLC |
02.24.2021 |
$5,502,900 |
220-235 |
Cross Connection Control Data Management System |
Aaron Miranda |
Linko Technology, Inc/DBA Tokay Software |
11.23.2020 |
$12,690 |
220-212 |
Uhland Road Improvements |
Rachel Shelton |
Patin Construction, LLC |
01.05.2021 |
$6,495,711.54 |
220-210 |
Fredericksburg St. Wastewater Replacement |
Rachel Shelton |
Insituform Technologies, LLC |
06.16.2020 |
$93,300 |
220-208 |
Public Services Monopole Tower Installation |
Rachel Shelton |
Johnston Technical Services, Inc |
08.18.2020 |
$286,381.31 |
220-163 |
S. Guadalupe Street Improvements |
Rachel Shelton |
ALL BIDS REJECTED |
6.02.2020 |
NO AWARD |
220-179 |
Lift Station No 28 Rehabilitation |
Rachel Shelton |
T. Gray Utility |
08.04.2020 |
$370,499.49 |
220-149 |
Police Department Additions & Renovations |
Rachel Shelton |
Trimbuilt Construction Inc. |
06.16.2020 |
$9,141,358 |
220-148 |
Hunter Rd. Restriping |
Rachel Shelton |
Flasher Equipment Co. |
08.04.2020 |
$183,363.45 |
220-139 |
Irrigation Design & Installation for Discovery Center |
Connie Singleton |
Diamondback Landscaping |
02.15.2020 |
$18,530.72 |
220-101 |
Catering Golden Sweethearts Ball |
Connie Singleton |
Root Cellar Catering |
02.12.2020 |
$7,087.30 |
220-099 |
Main Lift Station Force Main Replacement |
Rachel Shelton |
Cash Construction Co., Inc |
04.07.2020 |
$6,349,508.74 |
220-096 |
Maintenance & Repairs Fitness Equipment |
Connie Singleton |
Texertex |
12.20.2019 |
$8,400 |
220-064 |
ITIL 4 Foundation Training |
Connie Singleton |
California Creative Solutions |
01.30.2020 |
$5,995 |
220-048 |
Concrete Construction |
Rachel Shelton |
ACE Co. |
04.06.2020 |
$601,947 |
220-003 |
Risk Resilience Assessment-Emergency Response Plan for City Water Infrastructure |
Veronica Bradshaw |
Freese & Nichols, Inc. |
03.17.2020 |
$124,600 |
220-004 |
Animal Shelter-Animal Control Mgmt Software |
Veronica Bradshaw |
Pethealth Services (USA), Inc. |
05.12.2020 |
$7,500 |
220-032 |
Electric Utility Master Plan |
Veronica Bradshaw |
Stanley Consultants, Inc. |
03.17.2020 |
NTE $400,000 |
220-034 |
Blanco River Waterline Improvements |
Rachel Shelton |
Smith Contracting |
03.09.2020 |
$795,933.75 |
220-011 |
Ready-Mix Concrete |
Rachel Shelton |
XEVEX Materials |
12.20.2019 |
$102,000 |
219-294 |
Pest Control Services |
Connie Singleton |
Pest Management |
12.23.2019 |
$9,958.41 |
219-374 |
RM12-FM2439 Intersection Improvements |
Rachel Shelton |
Lone Star Sitework |
09.04.2020 |
$529,832.56 |
219-327 |
Hopkins Street Reconstruction |
Rachel Shelton |
Jordan Foster Construction |
03.10.2020 |
$10,070,388.46 |
219-328 |
E. Hopkins Pedestrian & Bike Improvements |
Rachel Shelton |
Montoya Anderson Construction, Inc. |
10.07.2020 |
$1,483,214 |
219-397 |
Potable Water Storage Tank Inspection |
Connie Singleton |
U.S. Underwater Service |
09.15.2019 |
$2,990 |
219-276 |
Belvin Street Curb Project |
Charles Blue |
Xevex Construction, LLC |
6.14.2019 |
$30,600 |
219-253 |
Generator Maintenance Repair Parts Facilities |
Connie Singleton |
LJ Power |
08.20.19 |
$30,000 |
219-248 |
Purgatory Creek Trail Improvements |
Charles Blue |
MAC, Inc. |
6.18.2018 |
$590,296 |
219-246 |
Concrete Ramp at Treatment Plant |
Charles Blue |
Xevex Construction, LLC |
4.19.2019 |
$19,800 |
219-238 |
Downtown Sidewalk Cleaning Services |
Connie Singleton |
De Angelo Brothers |
05.01.2019 |
$25,648 |
219-236 |
Surface Water Treatment Plant Low Water Crossing Improvements |
Charles Blue |
Westar Construction, Inc. |
6.18.2019 |
$192,940.50 |
219-223 |
Disposal of Hazardous Household Waste |
Connie Singleton |
Clean Earth of Alabama |
08.12.19 |
$14,880 |
219-211 |
Printing CVB Map Brochures |
Connie Singleton |
Aus-Tex Printing |
04.02.2019 |
$3,855.47 |
219-140 |
Manufactured Sand for Transportation |
Rachel Shelton |
Martin Marietta Materials SW |
02.11.19 |
$24,000 |
219-198 |
Wood Grinding Services |
Connie Singleton |
Eggemeyer Land Clearing |
06.03.2019 |
$100,000 |
219-167 |
214 E. Hutchison Street Improvements |
Charles Blue |
T.F. Harper and Associates |
05.07.2019 |
$360,032.95 |
219-160 |
Parking Pad for WWW Department |
Charles Blue |
Rucoba & Maya Construction |
1.14.2019 |
$21,360 |
219-114 |
Manufactured Sand for Transportation |
Rachel Shelton |
Cancelled |
N/A |
N/A |
219-121 |
Sewer Line Replacement SM Police Department |
Charles Blue |
Kelly Williams Plumbing, Inc. |
1.3.2019 |
$24,000 |
219-056 |
Concrete Contract for Transportation |
Rachel Shelton |
XEVEX Materials |
11.13.2018 |
$49,999 |
218-230 |
On-Call Stormwater Consulting Professional Services |
Veronica Bradshaw, CPPB |
Elizabeth Arceneaux, PE |
11.07.2018 |
$200,000.00 |
218-230 |
On-Call Stormwater Consulting Professional Services |
Veronica Bradshaw, CPPB |
Doucet & Associates, Inc. |
11.07.2018 |
$200,000.00 |
218-230 |
On-Call Stormwater Consulting Professional Services |
Veronica Bradshaw, CPPB |
Freese & Nichols, Inc. |
11.07.2018 |
$200,000.00 |
218-230 |
On-Call Stormwater Consulting Professional Services |
Veronica Bradshaw, CPPB |
Utility Engineering Group |
11.07.2018 |
$200,000.00 |
218-386 |
Architecture/Engineering Services for Police Department Building Renovations & Additions |
Veronica Bradshaw, CPPB |
KGA Architecture |
01.15.2019 |
$459,000.00 |
219-080 |
Airport Tower Waterline Replacement |
Charles Blue |
Kelly Williams Plumbing |
01.23.2019 |
$19,200.00 |
219-083 |
Lawn Maintenance Services |
Connie Singleton |
Landscape Commander |
01.15.2019 |
$60,450.00 |
219-090 |
Analytical Testing Services - Water |
Connie Singleton |
TestAmerica Laboratories |
02.05.2019 |
$25,592.00 |
219-130 |
Airport Runway Restriping |
Connie Singleton |
Roadway Striping, Inc. |
1.29.2019 |
$49,860.00 |
218-364 |
Meter Installation & Field Services Upgrade |
Connie Singleton |
Olameter Corporation |
12.12.2018 |
$597,935.64 |
218-017 |
Travis Street Heritage Drainage Outfall |
Charles Blue |
Cox Commercial Construction |
12.04.2018 |
$2,951,744.50 |
219-040 |
Removal Invasive Riparian Vegetation |
Connie Singleton |
EBR Enterprises |
01.01.2019 |
$38,949.00 |
219-068 |
Online continuing Education Fire Fighters |
Connie Singleton |
Praetorian Digital |
01.01.2019 |
$8,800.00 |
219-027 |
Aquatic Invasive Fish/Snail |
Connie Singleton |
Atlas Environmental |
01.01.2019 |
$22,800.00 |
219-119 |
Utility Rate Study |
Veronica Bradshaw, CPPB |
GDS Associates, Inc. |
06.04.2019 |
$80,000.00 |
219-111 |
On-Call Survey Services |
Veronica Bradshaw, CPPB |
Byrn & Associates, Inc. |
05.07.2019 |
$50,000.00 |
219-111 |
On-Call Survey Services |
Veronica Bradshaw, CPPB |
Payne Industries, LLC |
05.07.2019 |
$50,000.00 |
219-111 |
On-Call Survey Services |
Veronica Bradshaw, CPPB |
Cobb Fendley & Associates, Inc. |
05.07.2019 |
$50,000.00 |
219-111 |
On-Call Survey Services |
Veronica Bradshaw, CPPB |
Doucet & Associates, Inc. |
05.07.2019 |
$50,000.00 |
219-111 |
On-Call Survey Services |
Veronica Bradshaw, CPPB |
Bowman Consulting Group Limited |
05.07.2019 |
$50,000.00 |
219-001 |
Tree Trimming Hourly Crew |
Connie Singleton |
Townsend Tree/National |
03.15.2019 |
$211,848.00 |
218-328 |
Bond Counsel Services |
Veronica Bradshaw, CPPB |
McCall, Parkhurst, and Horton, L.L.P. |
09.18.2018 |
|
218-327 |
Financial Advisor |
Veronica Bradshaw, CPPB |
Specialized Public Finance, Inc. |
09.18.2018 |
|
218-283 |
On-Call Appraisal Services |
Veronica Bradshaw, CPPB |
Eckmann Groll, Inc. |
01.15.2019 |
$50,000.00 |
218-283 |
On-Call Appraisal Services |
Veronica Bradshaw, CPPB |
Atrium Real Estate Services |
01.15.2019 |
$50,000.00 |
218-283 |
On-Call Appraisal Services |
Veronica Bradshaw, CPPB |
Allegiant Group, PLLC |
01.15.2019 |
$50,000.00 |
218-283 |
On-Call Appraisal Services |
Veronica Bradshaw, CPPB |
The Aegis Group, Inc. |
01.15.2019 |
$50,000.00 |
218-283 |
On-Call Appraisal Services |
Veronica Bradshaw, CPPB |
BBG, Inc. |
01.15.2019 |
$50,000.00 |
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Alan Plummer Associates |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
BGE, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Cobb Fendley & Associates |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
CP&Y, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Freese & Nichols, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Halff & Associates, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
HDR Engineering, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Jones & Carter |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
K Friese & Associates, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Kimley-Horn & Associates, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Lockwood Andrews & Newnam, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
RPS Infrastructure, Inc. |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Tetra Tech |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Walker Partners, LLC |
04.16.2019 |
|
219-129 |
On-Call Water/Wastewater Engineering Services |
Veronica Bradshaw, CPPB |
Weston Solutions |
04.16.2019 |
|
218-375 |
Municipal Court Collection Services |
Veronica Bradshaw, CPPB |
Perdue Brandon Fielder Collins & Mott, LLP |
12.01.2018 |
30% Maximum Fee |
219-209 |
3rd Party Developer Public Services Complex |
Rachel Shelton, CTCD |
Hunt San Marcos Development, LLC |
12.03.2019 |
$1,500,000.00 |
218-213 |
San Marcos Electric Utility Pole Survey |
Connie Singleton |
Texas Utility Engineering |
05.01.2018 |
$31,250 |
218-321 |
Disaster Management Software |
Connie Singleton |
Geopliant |
08.31.18 |
$12,000 |