Linda Drive Improvements

This project includes:

  • Replacement of approximately 7,000 feet of sewer main from the City’s main lift station along Linda Drive northeast to near the McCoy’s headquarters building. This sewer has deteriorated and needs to be replaced.
  • Storm water improvements replacing and extending the existing insufficient system along Linda Drive and Sherbarb Avenue. The required improvements were identified in the Stormwater Master Plan.
  • Underground relocation of the telecommunication lines along Linda Drive.
  • Water system improvements to upsize existing water mains and complete a loop to improve system reliability.  
  • Other street improvements to replace broken curbs and gutters and driveways.
  • Sidewalk extension along the south side of Linda Drive from Sherbarb St. to River Road.

Current Status

  • Preliminary engineering complete
  • 60 percent designs in progress
  • Construction is scheduled for FY 2022 at an estimated cost of $7.5M