Project Name: Blanco Vista Water Line
Project Number: 780
Project Manager: Jakob Peetz
Current Design Phase: 0%
Construction Estimate: $640,000
Construction Start Year: 2022
Project Information: This project consists of installing 1200 linear feet of 24 inch water line along Blanco Vista Blvd, connecting the proposed Elevated Storage Tank (EST) to the existing City's service line. The Blanco Vista Water Line will be designed and constructed as a seperate project due to the fact that the EST is being constructed as part of a project administed by the Alliance Regional Water Authority.
