- Home
- Departments
- Engineering & Capital Improvements
- Design & Construction Guide
- Standard Details
- Series 500 - Pipe & Appurtenances
Series 500 - Pipe & Appurtenances
ID Number |
Series 500 - Pipe & Appurtenance |
Adoption Date |
PDF |
---|---|---|---|
500S-B-SM |
Typical Concrete Filled Steel Pipe Bollard |
1/1/2020 |
|
501S-1-SM |
Encasement Detail With Casing Spacers |
1/1/2020 |
|
503S-2S-SM |
Storm Drain Curb Inlet Ring and Cover 25 5/8-inch Unbolted |
6/5/2014 |
|
503S-2W-SM |
Sanitary Sewer Ring and Cover (WAD) 24-inch - Unbolted |
6/5/2014 |
|
503S-3W-SM |
Sanitary Sewer Ring and Cover (WAD) 24-inch - Bolted |
6/5/2014 |
|
503S-4S-SM |
Storm Drain Manhole Ring and Cover 31 7/8" |
2/15/2019 |
|
503S-4W-SM |
Sanitary Sewer Manhole Ring and Cover 32-inch - Unbolted |
6/5/2014 |
|
503S-5W-SM |
Sanitary Sewer Manhole Ring and Cover 32-inch - Bolted |
3/16/2015 |
|
503S-7W-SM |
Cleanout Ring and Cover |
6/5/2014 |
|
506S-3-SM |
Pre-Cast Storm Drain Manhole |
2/15/2019 |
|
506S-4A-SM |
Minor Manhole Adjustment and New Manhole Construction |
1/1/2020 |
|
506S-8-SM |
Wastewater Manhole on Precast Base with Exterior Drop |
1/1/2021 |
|
506S-8A-SM |
Wastewater Manhole on Precast Base with Interior Drop |
1/1/2021 |
|
506S-10-SM |
Wastewater Manhole on Precast Base |
6/11/2018 |
|
506S-15-SM |
Manhole Abandonment |
11/18/2014 |
|
506S-15A-SM |
Abandon Line At Active Manhole |
11/18/2014 |
|
506S-MV-SM |
Manhole Vent |
2/15/2019 |
|
506S-WAD-SM |
Wastewater Access Device (W.A.D.) |
6/11/2018 |
|
508S-CC-SM |
Concrete Collar For Drainage Pipe |
1/1/2020 |
|
508S-3-SM |
Typical Pre-Cast Curb Inlet |
1/1/2021 |
|
508S-9-SM |
Precast 4-Side Area Inlet |
1/1/2021 |
PDF |
508S-13-SM |
Typical Headwall and Energy Dissipator |
11/18/2014 |
|
510S-TD-SM |
Utility Trench Dimensions |
1/23/2018 |
|
510S-1-SM |
Concrete Trench Cap |
8/4/2014 |
|
510S-CE-SM |
Concrete Encasement |
5/1/2015 |
|
510S-3-SM |
Typical Trench With Paved Surface |
6/11/2018 |
|
510S-3C-SM |
Typical Trench With Concrete Pavement |
6/11/2018 |
|
510S-3FF-SM |
Street Trench Flowable Fill |
1/1/2021 |
|
510S-3T-SM |
Utility Trench Temporary Asphalt Pavement |
1/1/2021 |
|
510S-5-SM |
Trench Detail Natural Ground |
6/11/2018 |
|
510S-FUA-SM |
Franchise Utility Assignments |
1/1/2020 |
|
510S-M-SM |
Pipe Line Marker |
7/10/2015 |
|
510S-S&L-SM |
Service and Lateral Connection Trench Detail |
1/1/2020 |
|
510S-PM-SM |
Pipe Mandrel |
2/15/2015 |
|
510S-PR-SM |
Pipe Restraint Bell Joints |
2/15/2019 |
|
511-AW-03-SM |
Drain Valve |
12/19/2017 |
|
511S-BH-SM |
Blow-off Hydrant |
6/2/2017 |
|
511S-1A-SM |
1-inch Air Release Valve |
1/1/2020 |
|
511S-2A-SM |
2-inch Air Release Valve |
2/15/2019 |
|
511S-7-SM |
Typical Gate Valve 2-inch to 24-inch |
2/15/2019 |
|
511S-9B-SM |
Blow-off Assembly |
6/2/2017 |
|
511-17-SM |
Standard Fire Hydrant |
2/15/2019 |
|
511-20-SM |
Automatic Flush Valve |
2/15/2019 |
|
511-SP-SM |
Disinfection Water Sample Port |
1/1/2020 |
|
511S-TBA-SM |
Temporary Blow-off Assembly |
2/15/2015 |
|
520-AW-01A-SM |
Water Service and Wastewater Connection at Same Lot Line |
6/11/2018 |
PDF |
520-AW-01B-SM |
Wastewater Connection on Existing Main |
1/1/2020 |
|
520S-1-SM |
Single Lateral Connection |
1/1/2020 |
|
520S-3-SM |
Dual Lateral Connection |
1/1/2020 |
|
520S-4-SM |
Existing Wastewater Cleanout Adjustment to Grade in Driveway |
2/15/2015 |
|
520S-4A-SM |
Wastewater Cleanout |
6/2/2017 |
|
520-4B-SM |
Wastewater Sample Port |
6/2/2017 |
|
520-6-SM |
Wastewater Deep Lateral Connection Detail |
1/1/2020 |
|
520S-WMT-SM |
Water Main Tap |
1/1/2020 |
|
520S-AT-SM |
Abandon Tap |
9/11/2014 |
|
520S-9-SM |
5/8-inch, and 3/4-inch Duel Meter Service Connections (Irrigation or Domestic) |
1/1/2020 |
|
520S-11-SM |
5/8-inch, 3/4-inch, and 1-inch Single Meter Service Connection (Irrigation or Domestic) |
1/1/2020 |
|
520S-13.1-SM |
1 1/2-inch Irrigation Meter Service Installation |
6/2/2017 |
|
520S-13.2-SM |
2-inch Irrigation Meter Installation |
6/2/2017 |
|
520S-13.3-SM |
1.5-inch Domestic Meter Service Connection With Bypass |
6/2/2017 |
|
520S-13.4-SM |
2-inch Domestic Meter Service Connection With Bypass |
6/2/2017 |
|
520S-15A-SM |
3-inch Domestic Meter Service Connection With Bypass |
1/1/2021 |
|
520S-15B-SM |
4-inch, 6-inch, 8-inch and 10-inch Domestic Meter Service Connection With Bypass |
1/1/2021 |
|
520S-17-SM |
Fire Domestic Meter Installation |
11/1/2020 |
|
520S-19D-SM |
Double check Valve Backflow Prevention Assembly 3/4-inch to 2-inch |
1/1/2020 |
|
520S-19E-SM |
Double check Detector Assembly 3-inch to 10-inch |
6/2/2017 |
|
520S-19F-SM |
Reduce Pressure Principle Backflow prevention Assembly 3/4-inch to 2-inch |
6/2/2017 |
|
520S-19G-SM |
Reduce Pressure Principle Detector Assembly 3-inch to 10-inch |
6/2/2017 |